§ 162-10. Submittals.  


Latest version.
  • The developer shall submit to the City a preliminary drainage plan or engineering report on the proposed improvements pertaining to drainage and stormwater control. This report shall contain information on the existing conditions at the site, including existing and proposed drainage directions and elevations and slopes of all nearby drainage facilities. Runoff calculations shall be provided for the site in both predeveloped and developed conditions, and off-site drainage to the site shall be addressed. Where practical, this submittal may be combined with the erosion control plan submittal required under Chapter 147, Construction Site Erosion Control.